CPC 1405.2 · Firestop protection

Metal pipe through concrete: grout instead of a firestop product

For cast-iron, copper, copper-alloy, or steel pipe through a concrete or masonry rated assembly, concrete, mortar, or grout can fill the gap if the pipe is 6 inches or smaller and the opening is no more than 144 square inches. The fill has to hold back flame and hot gases for the assembly's rating.

2025 California Plumbing Code, Chapter 14 (Firestop Protection) · Applies to: Homes and commercial buildings

Concrete wall section with a metal pipe through it and the ring around the pipe filled with grout, with the 6 inch pipe limit and 144 square inch opening limit marked.
Grout can stand in for a firestop product only for metal pipe 6 inches or smaller in an opening of 144 square inches or less. Diagram: Hoffman & Sons Plumbing (hoffmanandsons.com), CC BY 4.0. Free to share with credit. PNG · SVG · All diagrams

The rule

Noncombustible pipe still has to restore the rating of a wall or floor it goes through. The general rule is the same as for plastic: an approved firestop system. But there's a shortcut for metal pipe through concrete or masonry.

Concrete, mortar, or grout can fill the ring around cast-iron, copper, copper-alloy, or steel pipe, as long as the pipe's nominal diameter is no more than 6 inches and the opening isn't bigger than 144 square inches.

The fill has to go the full thickness of the assembly, or be thick enough to give a rating at least equal to the assembly's. It also has to stop flame and hot gases that could ignite cotton waste for the time of the assembly's rating, when tested to the standards in the firestop section.

Outside that exception, noncombustible pipe goes back to the regular firestop system rules. Unshielded couplings can't connect noncombustible piping at the penetration unless the fire-resistive integrity can be shown.

On the job

  • Work out the opening size, not only the pipe size. A 6 inch pipe in a 14 by 14 inch hole is 196 square inches, so the grout shortcut doesn't apply.
  • Don't use the shortcut in drywall or wood-frame rated assemblies. It's written for concrete and masonry.
  • Ask the inspector what documentation they want for the fill material before you pour. It has to be a material that passes the flame and hot-gas test, not just any mortar.

The inspector and your city's adopted edition have the final word.

Give us a call

Call (760) 912-9831