Home › Code Library › Diagrams
Code Library
Plumbing code diagrams
216 original diagrams of the 2025 California Plumbing Code: clearances, slopes, fixture units, venting, water heaters, backflow, gas piping and more. Use them on job sites, in plan sets and in training, with credit.
Free to share, with credit
Every diagram here is drawn by Hoffman & Sons Plumbing and licensed Creative Commons Attribution 4.0 (CC BY 4.0). You can copy, print, and adapt them. Credit "Hoffman & Sons Plumbing" and link to hoffmanandsons.com (or the section page). Each diagram is a summary; check the official code and your inspector before you build.
-
CPC 102.2
Existing plumbing: what can stay
Legal when installed, same design and location, no hazard: it can stay. Change it and the new work follows today's code.
PNG · SVG · Read the section
-
CPC 102.3
Who keeps the plumbing safe
The owner or the owner's agent keeps the system and its required safeguards working, to the edition they were installed under.
PNG · SVG · Read the section
-
CPC 102.4
Addition tied into an existing house
The addition is built to new-work code. The old drain carries it only if it tests to new-work standards, and unused openings get capped.
PNG · SVG · Read the section
-
CPC 104.1
One plumbing permit per building
Install, alter, repair, replace, or remodel: a separate permit for each building or structure, before the work starts.
PNG · SVG · Read the section
-
CPC 104.2
Repair or replace: where the permit line falls
Stop the leak or clear the stoppage and no permit is needed. Cut out and replace pipe, a trap, a valve, or a fixture and it's permitted work.
PNG · SVG · Read the section
-
CPC 104.4
From application to permit expiration
California: start within 12 months, don't stall for 12 months, and extensions are written and up to 180 days each.
PNG · SVG · Read the section
-
CPC 105.2
The three plumbing inspections
Underground before backfill, rough-in before wall or ceiling membranes, final on completion.
PNG · SVG · Read the section
-
CPC 105.3
Test, witness, approve
Test it first, test it with the inspector watching, and a pass earns a certificate of approval. A fail means correct and retest.
PNG · SVG · Read the section
-
CPC 301.2
Listed, marked, and approved
Third-party listed, marked by the manufacturer, free of defects. If the code doesn't cover it, get approval before it's installed.
PNG · SVG · Read the section
-
CPC 304.1
Every fixture drains to the building drain
Fixtures and appliances that discharge liquid waste connect properly to the drainage system of the building.
PNG · SVG · Read the section
-
CPC 309.2
Replace the defect, don't cover it
A crack or hole gets a new piece of pipe or fitting, not solder, cement, paint, wax, tar, or a sealer.
PNG · SVG · Read the section
-
CPC 310.1
Seven fittings that can't be drainage fittings
Double hub, tee branch, tapped tee branch, side inlet quarter bend, running thread, band, and saddle: none of them as a drainage fitting.
PNG · SVG · Read the section
-
CPC 310.2
Cut in a fitting, don't tap the pipe
No drilling and tapping drain or vent pipe, and no threading cast-iron soil pipe. Cut the pipe and install a proper fitting.
PNG · SVG · Read the section
-
CPC 310.3
Nothing ties into the closet bend
Other fixtures drain into the branch or stack, never into the closet bend or stub of a water closet.
PNG · SVG · Read the section
-
CPC 310.4
Vent pipes and waste pipes keep their own jobs
Waste pipes carry waste, vent pipes carry air. The only exceptions are the special venting sections, and single-stack with unvented branches is prohibited.
PNG · SVG · Read the section
-
CPC 310.5
Keep the waterway clear
Normal pipe friction only. Burrs, sags, and homemade restrictions are out, but a 3 inch closet bend can be enlarged to 4 inches.
PNG · SVG · Read the section
-
CPC 310.6
Mixed metals: exposed or accessible only
Where different metals meet, the joint stays exposed or accessible. Necessary valves are the exception.
PNG · SVG · Read the section
-
CPC 311.1
Separate drainage for each building
Each building has its own independent drainage and sewer connection. Exceptions: a rear building with no sewer available, and California's ADU note.
PNG · SVG · Read the section
-
CPC 312.1
Protecting pipe through walls, cinders and slabs
Protect the pipe from breakage and corrosion, let hot lines move, and seal the void where pipe comes through a slab on grade.
PNG · SVG · Read the section
-
CPC 312.2
No pipe embedded in concrete, and room to move
Sleeve it, don't pour it: pipe passes through concrete in a sleeve, and runs have room to expand, contract and settle.
PNG · SVG · Read the section
-
CPC 312.3
Where unapproved drain pipe can't go
Pipe not approved for use under or within a building stays out of the shaded zone: under the structure, within 2 feet of it, and the top 1 foot of soil.
PNG · SVG · Read the section
-
CPC 312.6
Freezing protection for exposed pipe
Outside, in attics or crawl spaces, and in exterior walls: where freezing is a concern, protect the pipe, and keep it on the warm side of the insulation.
PNG · SVG · Read the section
-
CPC 312.7
Pipe through a fire-rated assembly
Any pipe through a rated wall, floor, ceiling, roof/ceiling or shaft enclosure gets protected per the California Building Code or California Residential Code.
PNG · SVG · Read the section
-
CPC 312.9
Steel nail plate over pipe in framing
Pipe within 1 inch of the exposed face needs a No. 18 gauge steel plate running at least 1-1/2 inches past the pipe's outside diameter.
PNG · SVG · Read the section
-
CPC 312.10
Sleeves through concrete and masonry
Sleeve the pipe through concrete and masonry, seal the gap in exterior walls, and keep building loads off the pipe.
PNG · SVG · Read the section
-
CPC 312.11
Framing weakened by cutting or notching
A member weakened by cutting or notching gets reinforced, repaired or replaced, and the limits come from the California Building Code or California Residential Code.
PNG · SVG · Read the section
-
CPC 312.12
Rodentproofing pipe openings
Strainer openings 1/2 inch or smaller, metal collars on pipe openings, and tub waste openings to crawl spaces screened or collared.
PNG · SVG · Read the section
-
CPC 313.1
Supporting pipe, fixtures and appliances
Support comes from the code, the manufacturer's instructions and the inspector, with seismic restraint per the building code.
PNG · SVG · Read the section
-
CPC 313.3
Suspended pipe hanger spacing
Table 313.3 sets the maximum hanger spacing: closer for plastic, wider for steel, and a support at each horizontal branch connection.
PNG · SVG · Read the section
-
CPC 313.5
Underground pipe on a firm bed
Lay underground pipe on a firm bed for its entire length. A pipe bridging a void or resting on a rock is a correction.
PNG · SVG · Read the section
-
CPC 314.1
Trench beside a footing: the 45 degree line
A trench deeper than the footing and parallel to it stays outside a 45 degree line from the bottom exterior edge of the footing.
PNG · SVG · Read the section
-
CPC 314.4
Trench backfill and bedding
Clean earth in thin layers to 12 inches over the pipe, then machine backfill and compaction to grade; thermoplastic pipe gets a 4 inch granular bed.
PNG · SVG · Read the section
-
CPC 315.2
Smooth drain joints versus ledges and pockets
Keep the bore of a drain smooth. A ledge, shoulder, recess or reduction that obstructs flow is prohibited.
PNG · SVG · Read the section
-
CPC 318.1
Test gauge increments and range
Finer increments for lower test pressures, and a gauge range of no more than twice the test pressure.
PNG · SVG · Read the section
-
CPC 401.3
Where California's fixture flow limits come from
Chapter 4 holds the base limits, CALGreen covers nonresidential rates, and a lower Title 20 flow rate wins.
PNG · SVG · Read the section
-
CPC 402.5
Toilet, bidet and urinal clearances
Water closets: 15 in to the side wall, 30 in center to center, 24 in clear in front. Urinals: 12 in and 24 in.
PNG · SVG · Read the section
-
CPC 402.6
Closet flange and toilet connection
Flange bottom on the finished floor, about 7 in across, stub cut flush, corrosion-resistant bolts and an approved gasket.
PNG · SVG · Read the section
-
CPC 402.10
Access to concealed slip joints
A concealed slip joint needs an unobstructed access panel or utility space at least 12 in in its least dimension.
PNG · SVG · Read the section
-
CPC 402.11
Future fixtures: plugged stubs and pipe sizing
Rough in the future fixture with plugged fittings, and size drain and supply for it now.
PNG · SVG · Read the section
-
CPC 407.2
Faucet flow limits in 407.2
Residential lavatory faucets 1.2 gpm max (0.8 gpm min), public and common-area lavatory faucets 0.5 gpm, metering faucets 0.2 gallons per cycle.
PNG · SVG · Read the section
-
CPC 407.3
120 degree limit on public lavatory hot water
Public lavatory hot water tops out at 120°F (49°C), by a limiting device or an ASSE 1084 water heater.
PNG · SVG · Read the section
-
CPC 408.3
Showerhead and body spray flow limits
1.8 gpm at 80 psi per showerhead, and 1.8 gpm combined for everything on one valve.
PNG · SVG · Read the section
-
CPC 408.4
Shower valves and the 120°F limit
Individual pressure-balance or thermostatic valve at the point of use, limited to 120°F (49°C) at the showerhead.
PNG · SVG · Read the section
-
CPC 408.5
Shower drain: 2 inch outlet and tailpiece
Shower waste outlet and tailpiece: not less than 2 in diameter, with an ASME A112.18.2 strainer.
PNG · SVG · Read the section
-
CPC 408.6
Shower curb, flange and floor slope
Curb 1 in below the sides, 2 to 9 in above the drain, flange 1 in above the sides, floor sloped 1/8 to 1/2 in per ft.
PNG · SVG · Read the section
-
CPC 408.7
Shower compartment minimum size
At least 1024 sq in with a 30 in circle, clear to 70 in above the drain outlet. A 30 by 60 in receptor is exempt.
PNG · SVG · Read the section
-
CPC 408.8
Site-built shower pan lining and test
Lining up 3 in above the curb, pitched 1/4 in per ft to weep holes, no nails lower than 1 in above the curb, tested at 2 in for 15 minutes.
PNG · SVG · Read the section
-
CPC 409.4
120 degree limit on tub and whirlpool filler water
Tub and whirlpool fillers top out at 120°F (49°C), by a limiting device or an ASSE 1084 water heater.
PNG · SVG · Read the section
-
CPC 409.6
Whirlpool tub pump access and installation
Pump above the trap's crown weir, self-draining piping, and an access opening that lets the pump come out.
PNG · SVG · Read the section
-
CPC 411.2
Toilet flush volume: 1.28 gallons per flush
1.28 gallons per flush maximum, averaged for dual flush, with WaterSense performance for residential toilets.
PNG · SVG · Read the section
-
CPC 414.3
Dishwasher drain: air gap fitting connections
Dishwasher to air gap fitting (FL mark at or above the sink flood level), then to a wye, disposer or waste receptor.
PNG · SVG · Read the section
-
CPC 418.2
Floor drains: strainer and where they're required
Floor drain: approved strainer with a waterway equal to the tailpiece area, watertight at the floor, floor sloped to it.
PNG · SVG · Read the section
-
CPC 420.3
Pre-rinse spray valve flow limits
Class 1 1.00 gpm, Class 2 1.20 gpm, Class 3 1.28 gpm, and an integral automatic shutoff on every valve.
PNG · SVG · Read the section
-
CPC 422.1
How many fixtures: using Table 422.1
Occupant load, 50/50 split, table lookup, round up. Example: 100 occupants in a business gets 1 and 3 water closets.
PNG · SVG · Read the section
-
CPC 422.6
Public toilet compartments and privacy
Public water closets get an enclosed compartment with a door. All-gender rooms add lockable privacy compartments in California.
PNG · SVG · Read the section
-
CPC 501.1
Sizing a storage water heater by first-hour rating
Count bathrooms, count bedrooms, read the gallons, then match the Energy Guide label.
PNG · SVG · Read the section
-
CPC 502.1
Permit first, then the inspections
The permit comes before the work, and nothing gets covered until the inspector approves it.
PNG · SVG · Read the section
-
CPC 503.2
What the final inspection walks through
Straps, relief valve and discharge, pan, air, vent and clearances all stay visible until the inspector signs off.
PNG · SVG · Read the section
-
CPC 504.1
Water heater in a bedroom or bathroom: two ways
Direct-vent, or a sealed closet with a self-closing gasketed door and outdoor combustion air, for the water heater alone.
PNG · SVG · Read the section
-
CPC 504.4
Relief device pressure window
Relief setting: above water service pressure, no higher than 150 psi, on a listed device with no shutoff.
PNG · SVG · Read the section
-
CPC 504.5
Layers of protection on a water heater
The thermostat runs the heater; a listed overtemperature device and the relief valve are the backups.
PNG · SVG · Read the section
-
CPC 504.6
T&P relief valve: no shutoff, enough capacity
No shutoff anywhere from the tank to the open end, and the valve's capacity has to meet the heater's input rating.
PNG · SVG · Read the section
-
CPC 506.2
Indoor combustion air: the volume rule
Standard method: 50 cubic feet per 1000 Btu/h, counting rooms open to the heater without doors.
PNG · SVG · Read the section
-
CPC 506.3
Indoor combustion air openings
One opening within 12 inches of the top, one within 12 inches of the bottom, each 1 square inch per 1000 Btu/h and at least 100 square inches.
PNG · SVG · Read the section
-
CPC 506.4
Outdoor combustion air options
Two openings at 4000 or 2000 Btu/h per square inch, or one at 3000, all within 12 inches of the top and (for two) the bottom.
PNG · SVG · Read the section
-
CPC 507.2
Seismic strapping zones on a water heater
One strap in the upper third, one in the lower third, the lower one at least 4 inches above the controls.
PNG · SVG · Read the section
-
CPC 507.5
Water heater drain pan
Pan at least 1-1/2 inches deep, drain at least 3/4 inch, visible end, and the T&P never discharges into it.
PNG · SVG · Read the section
-
CPC 507.13
Water heater in a residential garage
Burner and ignition at least 18 inches above the garage floor (unless FVIR-listed), and guarded from vehicles.
PNG · SVG · Read the section
-
CPC 507.25
Working space in front of a water heater
Keep at least 30 inches of depth, width and height clear for service, unless something else is specified.
PNG · SVG · Read the section
-
CPC 507.26
Clearance to combustible materials
Listed heater: clearances from the listing. Unlisted heater: 12 inches on all sides and a protected floor.
PNG · SVG · Read the section
-
CPC 508.4
Water heater in an attic: access and working space
22 by 30 inch access, solid 24 inch walkway, 30 by 30 inch platform, and a receptacle and light near the heater.
PNG · SVG · Read the section
-
CPC 509.6
Type B gas vent termination at the roof
5 feet above the draft hood; roof-pitch height when 8 feet or more from a wall; otherwise 2 feet above the roof and anything within 10 feet.
PNG · SVG · Read the section
-
CPC 509.8
Through-the-wall vent terminal clearances
12 inches above grade, window and door clearances by input for direct vent, and 4 feet below or beside for non-direct vent.
PNG · SVG · Read the section
-
CPC 601.3
Potable, nonpotable and alternate water pipe labels
Green potable, yellow nonpotable, purple alternate sources. The label repeats at least every 20 feet and once per room.
PNG · SVG · Read the section
-
CPC 602.2
No cross-connection without an approved device
Drinking water and anything else only meet through a backflow device approved for the hazard.
PNG · SVG · Read the section
-
CPC 602.3
Submerged outlet vs air gap
Keep the outlet above the flood-level rim, or put an approved device on the supply.
PNG · SVG · Read the section
-
CPC 603.1
Equipment on the domestic supply: the 603.1 test
Equipment that can foul the supply is allowed only with an approved backflow device or assembly.
PNG · SVG · Read the section
-
CPC 603.2
Approval, testing and maintenance of backflow assemblies
Approve it, test it when it goes in or moves, test it every year, and use a certified tester.
PNG · SVG · Read the section
-
CPC 603.3
Which backflow device protects against what
RP covers every case. DC stops pollution only. Air gap, AVB and PVB stop back-siphonage only.
PNG · SVG · Read the section
-
CPC 603.4.3
Access and clearance for a backflow assembly
At least 12 inches under the assembly, and a platform if it sits more than 5 feet up.
PNG · SVG · Read the section
-
CPC 603.4.4
Air gap where potable water meets a drain
Two supply-pipe diameters of open air, never under 1 inch.
PNG · SVG · Read the section
-
CPC 603.5.6
Backflow protection for lawn sprinkler systems
No pump or injector: AVB, PVB, SVB, RP or PS 72 valve. Pump or backpressure, or chemical injection: RP.
PNG · SVG · Read the section
-
CPC 603.5.7
Hose bibb with backflow protection
Nonremovable bibb-type protection, or an AVB 6 inches above the highest point of use after the last valve.
PNG · SVG · Read the section
-
CPC 603.5.10
Backflow protection on a boiler fill line
DC, intermediate-vent preventer with PRV, or RP. Chemicals in the system: RP only.
PNG · SVG · Read the section
-
CPC 603.5.12
Backflow protection for beverage equipment
Carbonated: air gap or ASSE 1022 vented preventer. Ice makers and coffee machines: air gap or dual check.
PNG · SVG · Read the section
-
CPC 603.5.14
Fire sprinkler systems and backflow protection (California)
Class 1 and 2 sprinkler systems: no extra backflow device at the service. Chemicals or a nearby nonpotable source: RP or RP detector.
PNG · SVG · Read the section
-
CPC 604.1
Materials that touch drinking water
Everything wetted in a drinking water system needs NSF/ANSI/CAN 61. California homes add permit, certification, ventilation, gloves and a flush for CPVC.
PNG · SVG · Read the section
-
CPC 604.1.2
New PEX: flush, stand one week, flush again
First flush 10 minutes, fill and tag, stand at least 1 week, then flush every branch. Early use means running the water at least 2 minutes first.
PNG · SVG · Read the section
-
CPC 604.2
Lead limits for water supply parts
Drinking water: 0.25 percent weighted average, solder and flux 0.2 percent. Non-drinking supply parts: 8 percent.
PNG · SVG · Read the section
-
CPC 604.3
Where Type L and Type M copper can go
Type M: aboveground in or on a building, or underground outside of structures. Under the slab and other underground runs inside the building: Type L or heavier.
PNG · SVG · Read the section
-
CPC 604.13
Water heater connectors and the first 18 inches
Flexible metal connectors: 24 inches maximum. No PEX, PEX-AL-PEX, PE-AL-PE or PE-RT within the first 18 inches of connected piping.
PNG · SVG · Read the section
-
CPC 605.9
PEX joints: what to check
Tubing maker's fittings and instructions, NSF/ANSI 14 brass, ASSE 1061 push-fit, and at least 30-day UV protection in California.
PNG · SVG · Read the section
-
CPC 606.2
Where the fullway valves go
After the meter, to each separate building, at a supply tank, and on the cold supply to each water heater.
PNG · SVG · Read the section
-
CPC 606.3
Unit shutoff valves in a multidwelling building
Each unit gets accessible shutoff valves so one unit can be shut off without stopping the others.
PNG · SVG · Read the section
-
CPC 606.5
Control valves: appliances, fixtures and manifolds
Valve immediately ahead of each appliance. Manifold valves are labeled. A manifold that isn't readily accessible means a valve at every fixture.
PNG · SVG · Read the section
-
CPC 608.1
Minimum residual pressure: 15 psi
Residual pressure after friction and other losses has to be at least 15 psi. If it isn't, add a tank and pump or another means.
PNG · SVG · Read the section
-
CPC 608.2
Pressure regulator and expansion tank
Over 80 psi static: strainer, regulator set to 80 psi or less, then an expansion tank on the cold side after the regulator.
PNG · SVG · Read the section
-
CPC 608.3
Expansion tank and T&P valve on a closed system
Expansion tank on the building side of the check valve or backflow preventer. Storage water heater gets a T&P valve with a drain (608.5).
PNG · SVG · Read the section
-
CPC 608.5
T&P relief valve discharge piping
Full size, no valves, no traps, gravity drain, unthreaded end pointing down 6 in to 2 ft above grade (or through an air gap into the drainage system).
PNG · SVG · Read the section
-
CPC 608.7
Vacuum relief valve on an elevated tank
Tank above the fixture outlets: vacuum relief valve (ANSI Z21.22/CSA 4.4) on the tank or heater.
PNG · SVG · Read the section
-
CPC 609.2
Water pipe and sewer in a shared trench
Bottom of the water pipe at least 12 inches above the sewer top, on a solid shelf at least 12 inches to the side. Crossings: 12 inches above.
PNG · SVG · Read the section
-
CPC 609.3
Water pipe in or under a slab on grade
Inside the foundation limits: copper without joints where possible, brazed joints with wrought copper fittings, and coated ferrous pipe (galvanizing doesn't count).
PNG · SVG · Read the section
-
CPC 609.4
Testing hot and cold water piping
Water at least working pressure, or air at least 50 psi. Hold at least 15 minutes with no leakage. No air on plastic, except PEX, PP or PE-RT where the maker allows.
PNG · SVG · Read the section
-
CPC 609.10
Disinfecting a potable water system
Flush, then 50 ppm for 24 hours or 200 ppm for 3 hours, flush again to match the flushing water, and repeat if contamination persists.
PNG · SVG · Read the section
-
CPC 609.11
Water hammer arrester at a quick-acting valve
Approved mechanical arrester (ASSE 1010 or PDI-WH 201), as close as possible to the quick-acting valve.
PNG · SVG · Read the section
-
CPC 609.12
Hot water pipe insulation thickness
Insulation wall thickness: the pipe diameter for pipe up to 2 inches, at least 2 inches for 2 inch pipe and up. Exceptions at framing penetrations and between the stop and the fixture.
PNG · SVG · Read the section
-
CPC 610.4
Sizing with Table 610.4: a worked example
Example only: 45 psi available, 100 feet, 30 fixture units: a 3/4 inch meter with 1-1/4 inch supply carries 28 (too small), so use the 1 inch meter with 1-1/4 inch supply (38).
PNG · SVG · Read the section
-
CPC 610.12
Maximum water velocity in copper tube and fittings
Copper tube and fittings: 8 ft/s cold, 5 ft/s hot. The same limits apply through copper fittings on other tubing.
PNG · SVG · Read the section
-
CPC 611.4
Residential water softener sizing
3/4 inch connection for up to 2 bathroom groups, 1 inch for up to 4, engineered over 4. Drain through an air gap.
PNG · SVG · Read the section
-
CPC 701.2
Drain, waste and vent pipe: where each material can go
Table 701.2 says where each material can go; galvanized steel and 304 stainless stay 6 inches above grade, clay stays 12 inches below.
PNG · SVG · Read the section
-
CPC 702.1
Drainage fixture units for common home fixtures
A lavatory is 1 DFU, a tub or shower is 2, a washer is 3 and a toilet is 3; any trap size has its own cap.
PNG · SVG · Read the section
-
CPC 703.2
Fixture unit limits by drain pipe size
Add up the DFU, then pick the smallest pipe whose Table 703.2 limit covers it.
PNG · SVG · Read the section
-
CPC 704.2
Back-to-back fixtures on one vertical drain
Each fixture has its own trap and wastes separately into a double-fixture fitting with both inlets at the same level.
PNG · SVG · Read the section
-
CPC 704.3
Commercial sink and floor drain: how they connect
The sink drain joins first, the floor drain connects downstream of it, and nothing else ties in between.
PNG · SVG · Read the section
-
CPC 706.2
Horizontal drain into a stack: allowed fittings
Use a swept fitting into the stack; a plain two-inlet fitting at one level sends flow into the other inlet.
PNG · SVG · Read the section
-
CPC 706.3
Horizontal drain into another horizontal drain
Merge branches with the flow using a 45 degree wye or a combination wye and eighth bend.
PNG · SVG · Read the section
-
CPC 706.4
Vertical drain landing on a horizontal drain
Turn a vertical drain onto a horizontal one with a wye and eighth bend; use 60 degrees only in a true vertical position.
PNG · SVG · Read the section
-
CPC 707.0
Where drain cleanouts go on a horizontal drain
Upper end, every 100 feet, and every aggregate turn over 135 degrees; check the exceptions before you add or skip one.
PNG · SVG · Read the section
-
CPC 707.8
Cleanout clearances in front and under the floor
Keep 18 by 18 inches clear on small pipe and 24 by 24 on larger; under a floor, stay within 5 feet of the access opening.
PNG · SVG · Read the section
-
CPC 708.1
Building drain slope: 1/4 inch per foot
Run drains at least 1/4 inch per foot (2 percent); 1/8 inch per foot only for 4 inch and larger building drains the AHJ has approved.
PNG · SVG · Read the section
-
CPC 710.1
Backwater valve below the manhole cover level
Only fixtures below the next upstream manhole cover go through the backwater valve; upper floors join downstream of it.
PNG · SVG · Read the section
-
CPC 710.3
Sewage ejector: pump, check valve and gate valve
Pump at 20 gpm or more, backwater valve then gate valve on the discharge, and a size minimum that depends on the building type.
PNG · SVG · Read the section
-
CPC 710.6
Backwater valve in an access pit
Keep the valve reachable in a pit with a removable cover; it has to stay open in low flows.
PNG · SVG · Read the section
-
CPC 712.2
Water test: 10 foot head and 15 minutes
Fill to the point of overflow, or test in sections with at least a 10 foot head, and hold it 15 minutes.
PNG · SVG · Read the section
-
CPC 712.3
Air test: 5 psi held for 15 minutes
Seal every other opening, bring the gauge to a uniform 5 psi, and hold it 15 minutes with no added air.
PNG · SVG · Read the section
-
CPC 713.1
Sewer connection: public sewer or private system
Connect to the public sewer unless it is more than 200 feet from the proposed building.
PNG · SVG · Read the section
-
CPC 717.1
Building sewer sizing for 8 and 10 inch pipe
Size from total fixture units, check the slope row, and never go smaller than the building drain.
PNG · SVG · Read the section
-
CPC 718.1
Building sewer slope and bedding
Uniform 1/4 inch per foot on a firm bed; flatter slopes only where impractical and the AHJ approves.
PNG · SVG · Read the section
-
CPC 719.1
Building sewer cleanouts
One at the building drain and sewer connection, then at most 100 feet apart and at each aggregate turn over 135 degrees.
PNG · SVG · Read the section
-
CPC 720.1
Water pipe and clay sewer in one trench
Water pipe on a solid shelf, at least 12 inches above the sewer top and 12 inches clear to the side.
PNG · SVG · Read the section
-
CPC 721.1
Building sewer: minimum horizontal distances
Keep 2 feet from buildings, 50 feet from wells and streams, 1 foot from a water service line, and 10 feet from a public water main.
PNG · SVG · Read the section
-
CPC 722.1
Abandoned sewer: cap within 5 feet of the property line
Cap or plug an abandoned sewer within 5 feet of the property line; fill old tanks after the inspection.
PNG · SVG · Read the section
-
CPC 801.2
Air gap and air break on an indirect waste
Indirect waste ends in open air. Where a drainage air gap is required, it's at least 1 inch above the flood-level rim.
PNG · SVG · Read the section
-
CPC 801.3
Indirect waste for food and beverage equipment
Equipment drains to a floor sink: at least the unit's drain size, 1 inch minimum (3/4 inch for ice machines), 15 feet max.
PNG · SVG · Read the section
-
CPC 803.3
Indirect waste: length, trap and vent
Over 5 feet and under 15 feet: trapped, trap needn't be vented. Vents run separately to outside air. Cleanouts at turns.
PNG · SVG · Read the section
-
CPC 804.1
Clothes washer standpipe and trap heights
Trap 6 to 18 inches above the floor, never below. Standpipe 18 to 30 inches above the trap weir.
PNG · SVG · Read the section
-
CPC 807.3
Dishwasher air gap fitting on a kitchen sink
Dishwasher drain goes up through an air gap fitting with its FL mark at or above the sink's flood level, then to the disposer or tailpiece.
PNG · SVG · Read the section
-
CPC 810.1
Boiler blowoff through a condenser or sump
Steam and water over 140 degrees F go through a vented sump or condenser with a deep seal trap, never straight into the drain.
PNG · SVG · Read the section
-
CPC 814.1
Condensate disposal: slope and where it can go
Condensate goes to an approved fixture or disposal area through an indirect waste sloped at least 1/8 inch per foot.
PNG · SVG · Read the section
-
CPC 814.2
Condensate overflow protection options
Primary drain plus one more layer: float switch, second pan, higher second drain, or a pan with a switch. Extra drain 3/4 inch or larger, readily observed.
PNG · SVG · Read the section
-
CPC 814.3
Minimum condensate pipe size by tons (Table 814.3)
Up to 20 tons: 3/4 inch. 21 to 40: 1. 41 to 90: 1-1/4. 91 to 125: 1-1/2. 126 to 250: 2. Based on 1/8 inch per foot.
PNG · SVG · Read the section
-
CPC 814.5
Where air conditioning condensate can discharge
Condensate ends indirectly: receptor, dry well, mop sink, leach pit or a fixture tailpiece, with the line trapped.
PNG · SVG · Read the section
-
CPC 901.2
Why every trap needs a vent
The vent lets air in and out so water moving through the drain can't siphon the trap seal out or blow it back.
PNG · SVG · Read the section
-
CPC 901.3
Trap seal and the 1 inch water column limit
The vent system is designed so the outlet side of any trap stays within 1 inch of water column.
PNG · SVG · Read the section
-
CPC 903.1
Vent pipe material limits
Galvanized and 304 stainless vent pipe stay above ground, plastic follows firestop and plenum limits, and California limits ABS and PVC to two stories in HCD-regulated residential buildings.
PNG · SVG · Read the section
-
CPC 904.1
Vent size rules
Minimum 1-1/4 in and half the drain size for each vent, and the building's vents together at least the area of the largest sewer.
PNG · SVG · Read the section
-
CPC 904.2
Vent length and the one-third horizontal limit
A minimum-sized vent can have only one-third of its permitted length horizontal; upsize the whole vent one size and the limit goes away.
PNG · SVG · Read the section
-
CPC 905.1
Vent grade: no sags, drip back to the drain
A vent runs level or graded back to the drain it serves, never with a sag that holds water.
PNG · SVG · Read the section
-
CPC 905.2
Vent takeoff above the drain centerline
Take the vent off above the drain's centerline and downstream of the trap it serves.
PNG · SVG · Read the section
-
CPC 905.3
Vent rise above the flood-level rim
Each vent rises 6 in above its own fixture's flood-level rim before it offsets or joins another vent.
PNG · SVG · Read the section
-
CPC 905.6
Common vent: two fixtures, one double fitting
Each fixture wastes separately into a double fitting with both inlets at the same level, and the pipe above serves as their common vent.
PNG · SVG · Read the section
-
CPC 906.1
Roof vent termination height
Through the flashing, vertical, at least 6 in above the roof and 1 ft from any vertical surface.
PNG · SVG · Read the section
-
CPC 906.2
Vent clearance from openings and lot lines
Either 10 ft away or 3 ft above an openable window, door, opening or air intake; 3 ft in every direction from a lot line.
PNG · SVG · Read the section
-
CPC 907.2
Yoke vent between drainage and vent stacks
Yoke vent: wye below the lowest branch on the drainage stack, tied to the vent stack at least 42 in above the floor.
PNG · SVG · Read the section
-
CPC 908.1
Vertical wet vent
One vertical pipe both drains and vents up to four one- or two-fixture-unit fixtures on the same story, 6 ft developed length at most, 2 in minimum.
PNG · SVG · Read the section
-
CPC 908.2
Horizontal wet vent for a bathroom group
Lavatories upstream, a dry vent on the shower or tub, the toilet downstream of every other fixture, and anything else vented conventionally after that.
PNG · SVG · Read the section
-
CPC 909.1
Island sink loop vent
Vent up to drainboard height, return down to the drain through a wye, then a sloped foot vent to the nearest partition and the roof.
PNG · SVG · Read the section
-
CPC 910.3
Combination waste and vent: venting rules
Vent downstream of the uppermost fixture, at least half the drain's area, and a separate vent for any branch over 15 ft.
PNG · SVG · Read the section
-
CPC 910.4
Combination waste and vent sizing
Every waste pipe and trap goes up two pipe sizes over the Chapter 7 size and over the tailpiece, and branches join the main at no more than 2 percent.
PNG · SVG · Read the section
-
CPC 911.1
Circuit vent on a restroom branch
Up to eight fixtures on one branch, the circuit vent between the two most upstream trap arms, and a 2 in relief vent when four or more water closets connect to a stack.
PNG · SVG · Read the section
-
CPC 1001.2
One trap per fixture: the limits
One trap per fixture, one trap per trap arm, a tailpiece of 24 inches or less, and up to three adjacent compartments on a shared trap.
PNG · SVG · Read the section
-
CPC 1002.1
Why a trap needs a vent
A vent lets air move so the water seal stays in the trap.
PNG · SVG · Read the section
-
CPC 1002.2
Trap arm length to the vent (Table 1002.2)
Measure along the pipe from the trap weir to the inner edge of the vent, and keep it within the table.
PNG · SVG · Read the section
-
CPC 1003.1
Trap materials and what a good trap looks like
Self-cleaning, smooth inside, approved material. A tubing trap needs 17 gauge wall and the maker's stamp.
PNG · SVG · Read the section
-
CPC 1003.3
Trap size: the table floor, one size up, and match the arm
Start at the Table 702.1 size, go no more than one size up, and keep the trap the same size as its arm.
PNG · SVG · Read the section
-
CPC 1004.1
Traps the code doesn't allow
No S-traps, bell traps, crown vents, double traps, or movable parts. Drum and bottle traps are for special conditions.
PNG · SVG · Read the section
-
CPC 1005.1
Trap seal depth: 2 to 4 inches
The standing water between the dip and the weir must be 2 to 4 inches deep.
PNG · SVG · Read the section
-
CPC 1006.1
Floor drain: trap, full-view inlet, backwater valve
Visible inlet, a trap you can clean, and a backwater valve where sewage could flow back.
PNG · SVG · Read the section
-
CPC 1007.1
Trap seal primer on a floor drain
A primer keeps the seal in a rarely used floor drain, and it has to be accessible.
PNG · SVG · Read the section
-
CPC 1014.1
Grease interceptor: what drains through it
Grease-laden fixtures go through the interceptor. Toilets and urinals bypass it.
PNG · SVG · Read the section
-
CPC 1014.2
Hydromechanical grease interceptor rules
Vented flow control upstream, a vent downstream, and fixture capacity no more than 2-1/2 times the gpm rating.
PNG · SVG · Read the section
-
CPC 1017.1
Oil interceptor for a repair garage
Garage floor drains go straight to the oil interceptor, which has its own vapor vent and a 3 inch waste line.
PNG · SVG · Read the section
-
CPC 1101.2
Where rainwater is allowed to go
Storm sewer first, combined sewer if there's none, or another place the authority accepts. Houses can discharge onto lawns that drain away.
PNG · SVG · Read the section
-
CPC 1101.3
Storm water stays out of the sanitary sewer
Two systems, kept separate: sanitary to the sewer, rain to the storm side.
PNG · SVG · Read the section
-
CPC 1101.6
Subsoil drain and sump
Perforated pipe in rock beside the footing, then to daylight or to a sump with a pump of at least 15 gpm.
PNG · SVG · Read the section
-
CPC 1101.12
Primary and secondary roof drainage
A primary drain for normal rain and a backup 2 inches or more above the roof, or a scupper at least 4 inches high.
PNG · SVG · Read the section
-
CPC 1101.16
Leaders: protection, and the combined sewer connection
Guard leaders that can be hit, and on a combined sewer use a single wye at least 10 feet past the soil stack.
PNG · SVG · Read the section
-
CPC 1102.2
Dome strainer, and the flat-strainer exception
Roof drains get domed strainers. Serviced decks can use a flat strainer that sits level with the surface.
PNG · SVG · Read the section
-
CPC 1103.1
Sizing leaders from Table 1103.1
Match roof area and rainfall rate to the leader size in the table.
PNG · SVG · Read the section
-
CPC 1103.3
Gutter size, slope, and roof area (Table 1103.3)
A steeper gutter carries more roof area. Read size, slope, and rainfall rate from the table.
PNG · SVG · Read the section
-
CPC 1107.1
Storm drain tests: water and air
Water: 10 foot head for 15 minutes. Air: 5 psi for 15 minutes, and never on plastic pipe.
PNG · SVG · Read the section
-
CPC 1203.3
Gas piping inspection sequence
Rough before it's covered, final after it's closed in and before anything is attached to the piping.
PNG · SVG · Read the section
-
CPC 1208.3
Adding up the gas load
Size for every appliance running at once: add the inputs, then size the pipe to deliver that at the minimum inlet pressure.
PNG · SVG · Read the section
-
CPC 1208.5
Gas piping materials
Schedule 40 or heavier steel pipe is the workhorse; cast iron, PVC and CPVC are never used for fuel gas.
PNG · SVG · Read the section
-
CPC 1208.6
Where a gas meter can go
Ventilated and readily accessible for reading, replacement and maintenance.
PNG · SVG · Read the section
-
CPC 1208.7
Line pressure regulator installation
Valve upstream, regulator accessible and protected, vent to the outdoors at least 3 feet from ignition sources.
PNG · SVG · Read the section
-
CPC 1210.1
Underground gas pipe cover
12 inches of cover minimum, 18 inches where damage is likely, conduit where you can't get 12.
PNG · SVG · Read the section
-
CPC 1210.2
CSST installation checklist
The maker's instructions are part of the code: listed tubing, bonded, protected in walls, fixed appliances only.
PNG · SVG · Read the section
-
CPC 1210.3
Aboveground gas pipe supports and wall penetration
Off the ground, supported on schedule, and sealed where it goes through the wall.
PNG · SVG · Read the section
-
CPC 1210.4
Concealed gas piping in a wall and a slab
Striker barrier in hollow walls, 1-1/2 inches of concrete around pipe in a slab, and no solid partitions.
PNG · SVG · Read the section
-
CPC 1210.6
Gas pipe bend radius
Metallic: inside radius at least 6 times the outside diameter, 90 degrees at most. Plastic: at least 25 times the inside diameter, no joints in the bend.
PNG · SVG · Read the section
-
CPC 1210.8
Gas outlet projection and capping
At least 1 inch out of the wall, 2 inches off the floor, capped until the appliance is connected.
PNG · SVG · Read the section
-
CPC 1210.9
Where manual gas shutoff valves go
A valve upstream of every regulator, a marked emergency shutoff outside, and tagged, accessible system valves.
PNG · SVG · Read the section
-
CPC 1211.2
Bonding CSST gas piping
6 AWG copper minimum, 75 feet maximum, listed clamp, landing on the service grounding electrode system.
PNG · SVG · Read the section
-
CPC 1211.8
Earthquake-actuated gas shutoff valve: when the CPC applies
The CPC sets the certification and installation rule. Whether you need the valve is a local ordinance question.
PNG · SVG · Read the section
-
CPC 1212.1
Gas appliance connector rules
One listed connector per appliance, in the same room, with the shutoff valve upstream.
PNG · SVG · Read the section
-
CPC 1212.6
Appliance gas shutoff valve placement
Valve within 6 feet, upstream of the connector, with a union between the valve and the appliance controls.
PNG · SVG · Read the section
-
CPC 1212.9
Gas sediment trap
Downstream of the appliance valve, as close to the inlet as practical, a tee with a capped nipple.
PNG · SVG · Read the section
-
CPC 1213.3
Gas piping test pressures
10 psi for 15 minutes, 60 psi for 30 minutes on welded or higher pressure piping, 30 psi for 30 minutes on higher pressure CSST.
PNG · SVG · Read the section
-
CPC 1215.1
Gas pipe sizing methods
Size from the point of delivery to the most remote outlet, using the method that fits the system.
PNG · SVG · Read the section
-
CPC 1404.3
Firestop at a rated floor penetration
Restore the assembly's rating with a tested system: F rating at least 1 hour and at least the assembly's, and floors need a T rating too.
PNG · SVG · Read the section
-
CPC 1404.6
Sleeve through a rated wall: two spaces to firestop
A sleeve adds two gaps. Fasten the sleeve, firestop the inside space and the outside space, and don't leave untested insulation through it.
PNG · SVG · Read the section
-
CPC 1405.2
Metal pipe through concrete: the grout exception
Grout can stand in for a firestop product only for metal pipe 6 inches or smaller in an opening of 144 square inches or less.
PNG · SVG · Read the section
-
CPC 1501.9
Required signs for treated gray water
Restroom sign: 1/2 inch letters where users can see it. Equipment room sign: 1 inch letters where anyone working on the gear will see it.
PNG · SVG · Read the section
-
CPC 1502.3
Two-phase cross-connection test
Pressurize one system, drain the other, hold at least 1 hour, check for flow, then swap. Flow from the drained side's outlets means a cross-connection.
PNG · SVG · Read the section
-
CPC 1503.1
Gray water: three tiers and the rules for all of them
Size sets the tier. Every tier needs a labeled diverter, no spray, no ponding or runoff, and at least 2 inches of cover.
PNG · SVG · Read the section
-
CPC 1503.1.1
Clothes washer system: laundry to landscape
Trapped standpipe, a labeled diverter to the landscape or the sewer, no ponding or runoff, and at least 2 inches of cover.
PNG · SVG · Read the section
-
CPC 1503.2
Gray water connection: diverter, backwater valve, overflow
Connect downstream of the fixture trap and vent, through an accessible, marked diverter valve, with a backwater valve at the sewer connection and a path to the sewer for overflow.
PNG · SVG · Read the section
-
CPC 1503.4
Gray water setbacks (irrigation field or mulch bed)
Irrigation field or mulch bed: 2 ft from buildings, 5 ft from the property line, 100 ft from wells and streams or lakes.
PNG · SVG · Read the section
-
CPC 1503.6
Soil and groundwater limits for gray water
Stay at least 3 feet vertical above seasonal high groundwater, and size the field from the soil: 20 sq ft per 100 gal/day in coarse sand up to 120 in clay.
PNG · SVG · Read the section
-
CPC 1504.5.2
Gray water drip field: what the guidance calls for
Test drip lines at 40 psi and hold them drip tight for 5 minutes before burial, cover them with at least 2 inches of mulch or soil, and add a PRV when the pump is over 20 psi.
PNG · SVG · Read the section
-
CPC 1505.1
Recycled water in a building: allowed uses
Utility recycled water comes in on its own purple line, serves the listed uses, and never connects directly to potable water.
PNG · SVG · Read the section
-
CPC 1505.5
Recycled water: pressure and purple marking
At least 15 psi at the highest, most remote outlet, 80 psi or less to the outlets, and purple pipe and equipment marked in black capital letters.
PNG · SVG · Read the section
-
CPC 1505.12
Recycled and potable pipes in one trench
12 in vertical and horizontal when both materials are approved for in-building use, otherwise 48 in horizontal, with potable above recycled either way.
PNG · SVG · Read the section
-
CPC 1601.3
Rainwater catchment: when no permit is required
No permit for outdoor non-spray irrigation up to 5000 gal when the tank is on grade, no taller than 2 to 1, with no power and no makeup water. Spray irrigation: 360 gal.
PNG · SVG · Read the section
-
CPC 1603.2
Rainwater hose bibb marking
Rainwater hose bibbs are allowed, as long as each one is marked CAUTION: NONPOTABLE RAINWATER, DO NOT DRINK, with the symbol from the code's figure.
PNG · SVG · Read the section