The rule
When recycled and potable water lines share a trench, the baseline is 12 inches of separation both vertically and horizontally. That works where both pipe materials are approved for use within a building.
If either piping material doesn't meet that standard, the minimum horizontal separation increases to 48 inches.
Either way, the potable pipe goes at a higher elevation than the recycled pipe.
Recycled water pipes laid in the same trench as building sewer or drainage piping, or crossing it, follow the code sections for water pipes near drains (Sections 609.0 and 720.0).
On the job
- Put the vertical and horizontal separations on the trench detail, and measure them before the inspector arrives. A narrow trench is where a 12 inch separation gets lost.
- Check the pipe materials before you decide which separation applies. If one isn't approved for use inside a building, you need the 48 inches.
- Mark recycled lines with purple tape or use purple pipe so nobody confuses them at the next dig.
The inspector and your city's adopted edition have the final word.