The rule
Install gas vents per the manufacturer's instructions. Where a Type B or Type L vent serves a draft-hood water heater, it ends at least 5 feet in vertical height above the highest connected draft hood or flue collar.
At the roof there are two cases. A vent that's 12 inches or less in size and at least 8 feet from a vertical wall or similar obstruction ends above the roof at the height in Table 509.6.1, which depends on roof pitch: 1 foot for flat to 6/12, 1.25 feet for over 6/12 to 7/12, 1.5 feet for over 7/12 to 8/12, and 2 feet for over 8/12 to 9/12, rising with steeper roofs. A vent over 12 inches, or less than 8 feet from a wall, has to end at least 2 feet above where it passes through the roof and at least 2 feet above any part of the building within 10 feet horizontally.
The vent goes through the roof flashing, jack or thimble and ends with a listed cap or listed roof assembly. It can't end adjacent to a wall or below eaves or parapets, and it has to be at least 3 feet above a forced air inlet within 10 feet. Where it passes through insulation, a steel shield of 26 gauge or heavier goes between the vent and the insulation and extends at least 2 inches above it. Screws and rivets can't poke through the inner wall of double-wall vent, except at the transition from the draft hood or connector.
On the job
- Find the roof pitch before you cut: pitch sets the height, and the 5 foot above-the-collar rule can control on a tall vent run.
- Check the distance to the nearest wall, dormer or higher roof. Inside 8 feet it's the 2-foot, 10-foot rule that applies.
- Look for forced air inlets (a furnace or air intake) within 10 feet of the cap. They need the 3 foot rise.
The inspector and your city's adopted edition have the final word.