CPC 1101.12 · Storm drainage

Roof drainage: primary and secondary (overflow) drains

Roofs drain through primary drains or gutters sized for a 60 minute, 100 year storm, plus a secondary (emergency) system: scuppers at least 4 inches high, or secondary drains set at least 2 inches above the roof surface, on a separate piping system or combined with the primary.

2025 California Plumbing Code, Chapter 11 (Storm Drainage) · Applies to: Homes and commercial buildings

A roof in cross-section with a primary drain at the low point, a secondary drain set at least 2 inches above the roof surface, and a parapet scupper at least 4 inches high.
A primary drain for normal rain and a backup 2 inches or more above the roof, or a scupper at least 4 inches high. Diagram: Hoffman & Sons Plumbing (hoffmanandsons.com), CC BY 4.0. Free to share with credit. PNG · SVG · All diagrams

The rule

Primary drainage is the roof drains or gutters that handle normal rain. They're located and sized with the structural design and pitch of the roof. Unless the authority having jurisdiction says otherwise, the drains, gutters, vertical conductors or leaders, and horizontal storm drains are sized for a storm of 60 minutes' duration and a 100 year return period.

The secondary system is the backup for when the primary clogs or is overwhelmed. It can be an open-sided roof or scuppers where the roof edge extends up and traps water. Scupper openings are at least 4 inches high, with a width equal to the circumference of the roof drain required for the area served. Or it can be secondary roof drains, set at least 2 inches above the roof surface and no higher than the ponding depth the roof was designed for.

Secondary roof drains connect one of two ways. A separate piping system, independent of the primary, discharges above grade where occupants or maintenance people can see it. Or they connect into the primary vertical conductor downstream of the last horizontal offset below the roof, and the combined system is sized for double the local rainfall rate.

On the job

  • Coordinate with the structural engineer. The ponding depth the roof can carry decides how high the secondary drain or scupper goes.
  • On a separate secondary system, the discharge has to be where somebody can see it. A tail pipe at grade that's visible when the primary clogs is the point.
  • If you tie secondary drains into the primary conductor, connect below the last offset so water can't back up into the roof.

The inspector and your city's adopted edition have the final word.