The rule
Receptors built on site are made of dense, nonabsorbent, noncorrosive materials, adequately reinforced, with an approved flanged floor drain that makes a watertight joint at the floor, and smooth, impervious, durable surfaces.
The subfloor and the rough side of the walls are lined to a height of at least 3 inches above the top of the finished dam or threshold. Where there's a built-in seat, the lining goes at least 3 inches above the horizontal surface of the seat. The lining is pitched 1/4 inch per foot to the weep holes in the subdrain over a smooth, solid subbase, then turned over the curb and fastened on its outside face.
The lining can't be nailed or perforated at a point less than 1 inch above the finished dam or threshold. The subdrain sits flush with the subbase, has a clamping ring or similar device that makes a tight connection with the lining, and has weep holes into the waste line that are protected from clogging.
To test, fill the receptor with water to a depth of not less than 2 inches for not less than 15 minutes. If there's no threshold, build a temporary 2 inch barrier. The test plug is set so both the upper and under sides of the subpan are tested where it clamps to the drain.
On the job
- Set the test plug in the drain so the water also loads the underside of the pan at the clamping ring. Mark the water line, and run the full time before you cover anything.
- Fasten the lining high, above the 1 inch line over the curb. A staple through the lining below that line is a leak waiting to happen.
- Protect the weep holes at the clamping ring while the mortar goes in, so they don't clog.
- Ask the inspector when they want to see the pan test. It's usually the inspection that lets you move on to the setting bed.
The inspector and your city's adopted edition have the final word.