The rule
When the building sewer or drain in the trench is clay, or another material that isn't approved for use inside a building, the code limits how you can put water pipe beside it. Both conditions have to be met. The bottom of the water pipe is at least 12 inches above the top of the sewer or drain, and the water pipe sits on a solid shelf excavated at one side of the common trench, with a clear horizontal distance of at least 12 inches from the sewer or drain.
Where a water pipe crosses a clay or other not-approved sewer or drain, it goes at least 12 inches above it.
This section sets those separations for clay and other materials not approved for use within a building. It doesn't set the same separation when the sewer is an approved in-building material, but the inspector has the final word on local conditions.
On the job
- Cut the shelf into the trench wall at the right height. Don't build the shelf up out of loose backfill.
- Measure the 12 inches clear horizontally from the sewer's side to the water pipe, and 12 inches vertically from the top of the sewer to the bottom of the water pipe.
- For a crossing, set the water line over the sewer and keep the 12 inches. If the elevations won't allow it, the sewer line or the water line needs to be re-planned before you backfill.
The inspector and your city's adopted edition have the final word.