The rule
When two horizontal drains meet, the branch has to merge in the direction of flow. The code lists 45 degree wye branches, combination wye and one-eighth bend branches, or other approved fittings of equivalent sweep.
The tee that's allowed for a horizontal line entering a vertical stack (Section 706.2) isn't in this list. In a horizontal run, a branch dumping in square across the main slows the flow and invites stoppages.
Changes in direction in general are made with approved fittings of a one-sixteenth, one-eighth or one-sixth bend, or fittings of equivalent sweep (Section 706.1).
On the job
- Face the wye so the branch points downstream. Check it before you cement, because it's easy to set a wye backward in a trench.
- When a branch has to come in square to the main, the combination wye and eighth bend lets it turn into the flow instead of hitting the main head-on.
- Keep the slope on both lines through the connection. The branch invert shouldn't end up below the main's.
The inspector and your city's adopted edition have the final word.