The rule
The baseline is 1/4 inch of drop per foot of run, or 2 percent, in a uniform slope. That rule applies to the building drain and to other horizontal drainage piping, in practical alignment toward where the drain ends.
If the depth of the street sewer, structural features, or the building's arrangement make 1/4 inch per foot impractical, building drain piping 4 inches or larger in diameter can go down to 1/8 inch per foot, or 1 percent. That requires the Authority Having Jurisdiction's approval first.
The reduced slope also reduces capacity. The 4 inch and larger horizontal fixture unit limits in Table 703.2 assume 1/4 inch per foot, and you multiply by 0.8 at 1/8 inch per foot.
On the job
- Check slope with a level and a measured drop: 4 feet of pipe should fall 1 inch at 1/4 inch per foot. Check it again after the trench is bedded, since pipe moves.
- Get the AHJ's okay in writing, or at least on the permit record, before you plan on 1/8 inch per foot. It's not a call to make in the trench.
- Don't run it flatter in the middle to save depth. A uniform slope means no bellies or flat spots where solids settle.
The inspector and your city's adopted edition have the final word.