The rule
A building sewer has to be located on the lot of the building it serves, unless Section 721.2 allows using an abutting lot. It can't be closer to certain things than the minimum horizontal distances in Table 721.1.
The table's rows: 2 feet from buildings or structures (including porches, steps, covered patios, carports, covered walks and driveways and similar), clear of the property line adjoining private property, 50 feet from water supply wells, 50 feet from streams, 1 foot from an on-site domestic water service line, and 10 feet from a public water main for parallel construction.
Footnotes adjust some of these. The well distance can drop to 25 feet where the drainage piping is made of materials approved for use within a building. Crossing a public water main needs approval by the Health Department or the Authority Having Jurisdiction. See also Section 312.3.
On the job
- Check the distances against the site plan before you dig. Wells, streams and the water main are the ones that move the sewer route.
- Abutting-lot sewers need an easement and an agreement recorded with the county recorder and filed with the AHJ. Don't start digging next door on a handshake.
- Where the water service runs next to the sewer, remember Section 720.1 when they share a trench.
The inspector and your city's adopted edition have the final word.