CPC 722.1 · Sanitary drainage and sewers

Abandoning a building sewer, septic tank or cesspool

An abandoned building sewer, or the abandoned part, has to be plugged or capped in an approved manner within 5 feet of the property line. Abandoned septic tanks, cesspools and seepage pits are pumped out and filled, with an inspection before the final fill.

2025 California Plumbing Code, Chapter 7 (Sanitary Drainage) · Applies to: Homes and commercial buildings

Plan of an abandoned building sewer capped within 5 feet of the property line, with notes on pumping and filling an abandoned septic tank after inspection.
Cap or plug an abandoned sewer within 5 feet of the property line; fill old tanks after the inspection. Diagram: Hoffman & Sons Plumbing (hoffmanandsons.com), CC BY 4.0. Free to share with credit. PNG · SVG · All diagrams

The rule

When a building is demolished or a sewer is no longer used, the sewer (or the abandoned part of it) has to be plugged or capped in an approved manner within 5 feet of the property line. That leaves no open end of the old line at the lot boundary.

A cesspool, septic tank or seepage pit that's abandoned, discontinued or no longer connected to any fixture has to have the sewage removed and be completely filled with earth, sand, gravel, concrete or other approved material (Section 722.2).

Before filling, the top cover or arch is removed. The fill can't go above the top of the vertical sidewalls, or above the outlet pipe level, until the inspection has been called and the inspector has looked at it. After inspection it's filled to ground level (Section 722.3).

On the job

  • Plug the abandoned sewer at the right spot and call the inspection before you backfill. A cap you can't see is a cap the inspector can't pass.
  • On a demolition and rebuild, confirm with the building department whether the existing sewer is staying in service or being capped before you pull the demo permit.
  • Pumping a septic tank is a licensed hauler's job, so schedule it ahead of the fill inspection.

The inspector and your city's adopted edition have the final word.