The rule
Vent pipe and fittings have to meet the standards listed in Table 701.2. Section 903.1 adds a few limits on top of that list.
Galvanized steel and 304 stainless steel pipe can't go underground, and the code wants it at least 6 inches above ground. Anything buried, and the pipe right at grade, has to be another approved material, so plan the transition.
ABS and PVC DWV pipe follows the California Building Code's firestop rules where it passes through rated assemblies. Except in individual single-family dwelling units, plastic in a duct or plenum has to carry a flame-spread index of 25 or less and a smoke-developed index of 50 or less, tested to ASTM E84 or UL 723.
On the job
- Check the building type before you bid plastic vents. The two-story limit for HCD-regulated residential buildings can change the pipe choice on a multifamily or lodging job.
- Firestopping ABS and PVC at rated walls and floors is a separate step with its own sign-off. Ask what the plans show.
- If a plan calls for malleable iron vent fittings, they have to be galvanized in HCD 1 buildings.
The inspector and your city's adopted edition have the final word.