The rule
A combination waste and vent system uses an oversized drain as its own vent. It's allowed only where the structure keeps you from installing a conventional system, and the construction documents have to be approved by the authority having jurisdiction before you install any part of it.
The system still needs a real vent, or vents, enough to keep air moving. The vent's area has to be at least half the inside cross-sectional area of the drain pipe it serves, and it connects downstream of the uppermost fixture.
A branch longer than 15 feet is vented separately in an approved way. You can't just keep extending the oversized drain.
On the job
- Get the plans approved first. Roughing in a combination waste and vent and asking afterward is the way to tear it out.
- Half the area isn't half the diameter. Do the area math, or ask your inspector how they want the vent sized, before you order pipe.
- Check the length of each branch. Once one passes 15 feet, plan the extra vent.
The inspector and your city's adopted edition have the final word.