Home › Code Library › CPC 420.3

CPC 420.3 · Fixtures

Pre-rinse spray valve flow limits

A commercial food service pre-rinse spray valve is limited to 1.00 gpm (Class 1, 5.0 ounces-force or less), 1.20 gpm (Class 2, over 5.0 up to 8.0) or 1.28 gpm (Class 3, over 8.0), and it needs an integral automatic shutoff.

2025 California Plumbing Code, Chapter 4 (Plumbing Fixtures and Fixture Fittings) · Applies to: Commercial buildings

Bars comparing the 1.00, 1.20 and 1.28 gpm limits for Class 1, 2 and 3 pre-rinse spray valves, next to a spray valve with an automatic shutoff.
Class 1 1.00 gpm, Class 2 1.20 gpm, Class 3 1.28 gpm, and an integral automatic shutoff on every valve. Diagram: Hoffman & Sons Plumbing (hoffmanandsons.com), CC BY 4.0. Free to share with credit. PNG · SVG · All diagrams

The rule

Pre-rinse spray valves in commercial food service have a maximum flow rate set by Table 420.3, and each one has to have an integral automatic shutoff.

The table sorts valves by spray force. Product Class 1, at 5.0 ounces-force or less, is limited to 1.00 gpm. Class 2, over 5.0 and up to 8.0 ounces-force, is limited to 1.20 gpm. Class 3, over 8.0 ounces-force, is limited to 1.28 gpm.

The automatic shutoff means the valve closes when it's released, instead of running until someone turns it off.

On the job

  • Check the spray-force class on the valve's spec sheet or packaging, and match it to the limit in the table. A valve without a marked class is hard to approve.
  • Confirm the valve has the integral shutoff before it goes on the dish-room hose reel.
  • Section 401.3 adds that if state appliance law has a lower flow limit, the lower one applies.

The inspector and your city's adopted edition have the final word.

Give us a call

Call (760) 912-9831