Home › Code Library › CPC 609.4

CPC 609.4 · Water supply and distribution

Testing water piping: water or 50 psi air for 15 minutes

Test the hot and cold water system with water or air. Water test pressure has to be at least the working pressure, and the air test has to be at least 50 psi. The pipe has to hold for at least 15 minutes with no leakage, and plastic pipe isn't tested with air except PEX, PP or PE-RT where the manufacturer allows.

2025 California Plumbing Code, Chapter 6 (Water Supply and Distribution) · Applies to: Homes and commercial buildings

A water supply system under test with a gauge, and a panel comparing the water test, air test and plastic pipe rules with the 15 minute hold.
Water at least working pressure, or air at least 50 psi. Hold at least 15 minutes with no leakage. No air on plastic, except PEX, PP or PE-RT where the maker allows. Diagram: Hoffman & Sons Plumbing (hoffmanandsons.com), CC BY 4.0. Free to share with credit. PNG · SVG · All diagrams

The rule

When a section or the whole hot and cold water system is complete, it gets tested with water or air. A water test pressure has to be at least the working pressure the system will see. An air test is at least 50 psi.

Either way, the system has to hold the test pressure with no sign of leakage for not less than 15 minutes.

Plastic pipe isn't tested with air. The exception is PEX, PP or PE-RT tube, which can be air tested where the manufacturer's instructions permit it.

On the job

  • Put a gauge on the system and leave it visible for the inspector. A test that nobody can read doesn't count for much.
  • Test before the walls are closed. The test is there to find leaks you can still reach.
  • Look up the tubing manufacturer's instructions before air testing PEX, PP or PE-RT. Without that permission the test is with water.

The inspector and your city's adopted edition have the final word.

Give us a call

Call (760) 912-9831