CPC 905.3 · Vents

Vent rise: 6 inches above the flood-level rim before offsetting

Unless structure prevents it, each vent rises vertically to at least 6 inches above the fixture's flood-level rim before it offsets horizontally. Where vents join, each must first reach 6 inches above its own fixture's rim.

2025 California Plumbing Code, Chapter 9 (Vents) · Applies to: Homes and commercial buildings

Two lavatories with vents that each rise at least 6 inches above their own flood-level rim before running horizontally to join, with a panel for vents that can't reach 6 inches.
Each vent rises 6 in above its own fixture's flood-level rim before it offsets or joins another vent. Diagram: Hoffman & Sons Plumbing (hoffmanandsons.com), CC BY 4.0. Free to share with credit. PNG · SVG · All diagrams

The rule

The flood-level rim is the top edge of the fixture where water would spill over. A vent that turns horizontal below that point can fill with waste if the drain backs up and the fixture floods, so the vent has to rise at least 6 inches above the rim before going sideways.

When two or more vents come together, each one has to reach 6 inches above the rim of its own fixture before it connects to any other vent.

If the structure won't let a vent get to 6 inches above the rim, it's treated as a drain: use approved drainage fittings, drainage material, and grade it to the drain.

On the job

  • Measure from the rim, not from the countertop or the floor. A tub's rim and a lav's rim are at different heights.
  • Vent tie-ins in a wall are often done in a single wall cavity. Leave room for the 6 inch rise before you plan the offset.
  • If a joist or beam forces a low offset, change to drainage fittings and slope it back to the drain.

The inspector and your city's adopted edition have the final word.