CPC 402.11 · Fixtures

Future fixtures: plugged stubs and pipe sizing

If you rough in for a fixture that's coming later, size the drain and water supply piping for it now and end the stub with a plugged fitting. Where the plug sits at the point the trap would go, that fixture's plumbing has to be complete and meet the code.

2025 California Plumbing Code, Chapter 4 (Plumbing Fixtures and Fixture Fittings) · Applies to: Homes and commercial buildings

Wall elevation showing a capped drain branch, a capped vent and capped hot and cold stubs for a future lavatory shown as a dashed outline.
Rough in the future fixture with plugged fittings, and size drain and supply for it now. Diagram: Hoffman & Sons Plumbing (hoffmanandsons.com), CC BY 4.0. Free to share with credit. PNG · SVG · All diagrams

The rule

A basement bath rough-in, a future powder room, a second kitchen sink: whatever you provide for has to count when you size the drain and the water supply piping.

The construction for the future installation ends with a plugged fitting or fittings. A capped stub keeps the system closed until the fixture is added.

If the plugged fitting is at the point where the trap of the fixture will be installed, the plumbing for that fixture has to be complete and meet the code as if the fixture were already there.

On the job

  • Include the future fixture in your sizing when you add up the fixture units and the supply demand, even though nothing is installed yet. Undersizing a line to save a pipe size is the mistake to avoid.
  • Plug and brace every stub so it holds up through the pressure and drain tests at rough inspection.
  • Mark stub locations on the plans and on the framing. The next plumber shouldn't have to hunt for them behind finished drywall.

The inspector and your city's adopted edition have the final word.