CPC 803.3 · Indirect waste and condensate

Indirect waste pipe size, length, traps and vents

An indirect waste pipe under 15 feet is at least as large as the drain outlet or tailpiece it serves, never under 1/2 inch. A run over 5 feet and under 15 feet gets its own trap, which doesn't have to be vented. Vents from indirect waste go separately to outside air.

2025 California Plumbing Code, Chapter 8 (Indirect Wastes) · Applies to: Homes and commercial buildings

A length bar split at 5 feet and 15 feet: no direct trap on a short run, a direct unvented trap between 5 and 15 feet, and past 15 feet outside this section, with a separate vent and cleanouts at turns.
Over 5 feet and under 15 feet: trapped, trap needn't be vented. Vents run separately to outside air. Cleanouts at turns. Diagram: Hoffman & Sons Plumbing (hoffmanandsons.com), CC BY 4.0. Free to share with credit. PNG · SVG · All diagrams

The rule

Unless the rules for a specific type of equipment say otherwise, size indirect waste piping with the regular drainage and vent sections. For runs under 15 feet, the pipe is at least as large as the drain outlet or tailpiece on the fixture, appliance or equipment, and no smaller than 1/2 inch.

Length drives the trap rule. A run longer than 5 feet but under 15 feet is directly trapped, and that trap doesn't need a vent. Under 5 feet, this section doesn't call for that trap.

Vents from indirect waste piping can't be tied into a sewer-connected vent. They run separately to the outside air.

Angles and changes of direction in these lines need cleanouts so they can be flushed and cleaned.

On the job

  • Measure the developed length before you decide on the trap. A run just over 5 feet gets one, and a run just under doesn't.
  • Keep the indirect waste vent completely separate. If it ends up teed into a regular vent, that's a correction.
  • Put cleanouts at the turns, not just at the receptor, so each line can be flushed and cleaned.
  • At 15 feet the rules in this section stop and other sections take over. If a run is that long, talk to the inspector before you rough it in.

The inspector and your city's adopted edition have the final word.