Home › Code Library › CPC 1211.8

CPC 1211.8 · Fuel gas piping

Earthquake-actuated gas shutoff valves

The CPC requires an earthquake-actuated gas shutoff valve only where a local ordinance requires one. When one is installed, it has to be certified by the State Architect, and it's installed per the local ordinance or, if there isn't one, the manufacturer's instructions.

2025 California Plumbing Code, Chapter 12 (Fuel Gas Piping) · Applies to: Homes and commercial buildings

A decision flow: if local ordinance requires the valve, it must be State Architect certified and installed per the ordinance or the maker's instructions.
The CPC sets the certification and installation rule. Whether you need the valve is a local ordinance question. Diagram: Hoffman & Sons Plumbing (hoffmanandsons.com), CC BY 4.0. Free to share with credit. PNG · SVG · All diagrams

The rule

California adds this section to the plumbing code. It covers earthquake-actuated gas shutoff valves: valves that automatically shut off the gas at the valve location during a seismic disturbance.

The CPC doesn't itself order one for every building. The valves are provided for buildings when installation is required by local ordinance. They have to be certified by the State Architect as conforming to California Code of Regulations, Title 24, Part 12, Chapter 12-16-1.

Valves that aren't certified by the State Architect are prohibited in buildings open to the public where installation is mandatory under local ordinance. The valves are installed in accordance with the local ordinance and, where there's no ordinance, per the manufacturer's installation instructions.

So the answer to 'do I need one?' depends on the local ordinance for your location. Your city or county building department can tell you.

On the job

  • Ask the building department whether a local ordinance requires the valve for the type of work you're doing, before you quote it or order one.
  • Check the certification before you buy. A valve that isn't State Architect certified is the wrong valve where installation is mandated.
  • Keep the manufacturer's installation instructions in the file. If the ordinance doesn't say how to install it, those instructions control.
  • Keep this separate from water heater strapping, which is a different seismic rule in Section 507.2.

The inspector and your city's adopted edition have the final word.

Give us a call

Call (760) 912-9831