Plumbing work in California is built to the California Plumbing Code and checked by the local building department at three stages: underground, rough-in and final. The inspector and the city have the last word.

What it is

The 2025 California Plumbing Code (Title 24, Part 5) is based on the 2024 Uniform Plumbing Code and took effect at the start of 2026. Your city or county adopts it and its building department enforces it. Anything not covered goes to them for approval (CPC 301.2).

Code compliance isn't a step at the end. It runs through the whole job: how pipe is bedded, sized, vented, supported and tested, and whether the work is permitted and inspected.

How the work goes on a job

  1. Permit: each separate building or structure needs its own plumbing permit before work starts, unless the work is exempt (CPC 104.1, CPC 104.2). Approved plans and the permit stay on site (CPC 104.4).
  2. Underground: after the trench is dug and bedded and the pipe is in, before backfill.
  3. Rough-in: before wall or ceiling coverings go on.
  4. Final: when the installation is complete (CPC 105.2).
  5. Testing happens in the inspector's presence. A passing system earns a certificate of approval (CPC 105.3).

Inspections and tests the code calls for

A complete plumbing system installation moves through all three inspections in order. The permit holder schedules each one, and covered work that hasn't been approved has to be opened back up.

Special items have their own inspections. Gas piping has rough and final inspections (CPC 1203.3), and a water heater gets a final inspection before it's covered (CPC 503.2).

On remodels and additions, new work meets current code while existing plumbing that was legal when installed can stay (CPC 102.2, CPC 102.4). Ask which parts are being brought up to code and which are staying.

What you can safely check yourself

  • Ask who's pulling the permit and which inspections are on it, and ask to see the inspection record after each one.
  • Don't let a trench be backfilled or a wall be closed until the plumbing has been approved.
  • At the end, ask for the certificate of approval and keep it with your house records.
  • Browse the code library to see the rule behind any item.

Who it's for

Builders and general contractors who need permits, inspections and sign-offs to line up with the schedule. Homeowners building, remodeling or adding on who want to know what each inspection is for.

Where this sits on our service lists

On our New Construction list: “Code compliance and inspections”, “Complete plumbing system installation”.

Call or text

Call (760) 912-9831 or text (760) 912-9831 to talk through your project.

The inspector and the city's adopted edition have the final word on every code point on this page. The code library here summarizes the 2025 California Plumbing Code, effective at the start of 2026, in our own words.