Rough-in is the pipe inside the walls, floors and ceilings, set before the drywall goes up. The drain, waste and vent (DWV) system is the part that carries water away and lets the pipes breathe. Both get inspected while they are still open to view.

What it is

Rough-in is everything that has to exist before walls close: drain and vent piping, hot and cold supply lines, stub-outs where each fixture will go, and the gas stubs for appliances. The fixtures themselves come later, at trim-out.

The DWV system is its own set of rules. Drains slope toward the sewer. Every fixture trap holds a water seal and needs a vent, so air can move through the system and sewer gas stays out (CPC 901.2, CPC 1001.2).

How the work goes on a job

  1. Confirm fixture locations against the plans and the framing, including tubs, showers and any fixture that sits on an outside wall.
  2. Run drains and branches to the building drain at a workable slope, using fittings the code allows in a drain (CPC 310.1) and a material from the approved list (CPC 701.2).
  3. Route vents so each trap arm stays within its allowed length (CPC 1002.2), vent pipes drain back by gravity with no sags (CPC 905.1), and roof terminations clear the roof by the required height (CPC 906.1).
  4. Run hot and cold supply lines, with a control valve at each fixture or at a labeled manifold (CPC 606.5) and insulation on hot water pipe (CPC 609.12).
  5. Protect the pipe as it goes through framing: bore and notch within the code's limits (CPC 312.11), add steel nail plates where pipe sits within 1 inch of the face of the framing (CPC 312.9), and support the pipe properly (CPC 313.1).
  6. Firestop pipe that passes through rated walls and floors (CPC 312.7, CPC 1404.3), and leave access to concealed tub slip joints (CPC 402.10).
  7. Test, then call for the rough-in inspection before any wall or ceiling membrane goes on.

Inspections and tests the code calls for

Drain and vent piping is tested with water or air before the inspector arrives (CPC 712.2, CPC 712.3). Water piping is tested with water at working pressure or with air at no less than 50 psi, and it has to hold for at least 15 minutes with no leak (CPC 609.4).

The rough-in inspection has to pass before drywall, so it gets scheduled ahead of the drywall crew (CPC 105.2). Common corrections are a missing nail plate, an over-long trap arm and an unsealed or missing firestop.

What you can safely check yourself

  • While framing is open, take photos of every wall with pipe in it. They're useful later when you hang a shelf or plan a remodel.
  • Don't let anyone close up a wall until the inspector has signed off on the plumbing.
  • Once the house is finished, gurgling drains, slow drains or a sewer smell can point to a vent problem. From the ground, you can look at the vent pipes on the roof: if one looks damaged, crushed or covered, call a licensed plumber. Don't cap or remove a vent.

Who it's for

Builders and general contractors on residential and commercial new construction, remodels and additions, who need rough-in done in step with framing and ahead of drywall. Homeowners managing their own remodel can use the sequence above to know what should be visible, and when.

Where this sits on our service lists

On our New Construction list: “Rough-in plumbing”, “Drain, waste and vent systems”.

Call or text

Call (760) 912-9831 or text (760) 912-9831 to talk through your project.

The inspector and the city's adopted edition have the final word on every code point on this page. The code library here summarizes the 2025 California Plumbing Code, effective at the start of 2026, in our own words.