Home › Services › New Construction › Gas Line Installation and Repairs

New Construction and Service & Repair

Gas Line Installation and Repairs

Gas piping is permit work that gets inspected and pressure tested before it is put into service. If you smell gas, leave the building and call the gas utility or 911 from outside. Do not use a phone or switch inside.

What it is

Fuel gas piping carries gas from the meter to the appliances: water heater, furnace, range, dryer, fireplace or an outdoor appliance. New piping gets sized for the total connected load (CPC 1208.3). A repair replaces or fixes a section of existing piping, and the repaired piping gets tested again before gas is turned back on.

This is licensed work. It takes a permit, a licensed plumber and an inspector, and it isn't a do-it-yourself job.

How the work goes on a job

  1. Confirm the appliances, their inputs and where each one goes, then size the piping and choose the route (CPC 1208.3).
  2. Choose an allowed material: Schedule 40 steel, listed CSST or other materials the code allows. Cast iron, PVC and CPVC can't carry fuel gas (CPC 1208.5). CSST is installed to the maker's instructions and bonded (CPC 1210.2, CPC 1211.2).
  3. Run the piping. Buried pipe needs at least 12 inches of cover and corrosion protection (CPC 1210.1). Concealed pipe follows its own rules (CPC 1210.4). Aboveground pipe is supported and protected (CPC 1210.3).
  4. Set shutoffs: a manual valve ahead of each regulator and a valve within 6 feet of each appliance, with a sediment trap where one is required (CPC 1210.9, CPC 1212.6, CPC 1212.9). Leave unused outlets capped (CPC 1210.8).
  5. Call for the rough inspection with the pipe still exposed, then connect appliances with listed connectors (CPC 1203.3, CPC 1212.1).
  6. Pressure test and call for the final gas inspection (CPC 1213.3).

Inspections and tests the code calls for

Gas piping gets a rough inspection before anything covers it and a final inspection once concealed parts are closed in (CPC 1203.3). Standard piping is tested with air, CO2 or nitrogen at no less than 10 psi for at least 15 minutes with no drop, and higher pressures get a stronger test (CPC 1213.3). Never test with gas or a flame.

An earthquake-actuated gas shutoff valve is required by the plumbing code only where a local ordinance says so. Ask your building department whether one applies (CPC 1211.8).

What you can safely check yourself

  • Know where your gas shutoff valves are, at the meter and at each appliance. Look at them and keep them clear. Don't turn gas valves off or on unless your gas utility or a licensed plumber has shown you how.
  • Keep shrubs, boxes and fences away from the meter so the utility can reach it.
  • Leave caps on gas outlets and on the sediment trap below an appliance.
  • Before any digging, call 811 so lines get marked. Don't cut into a wall or slab where gas pipe may run.
  • If you smell gas, leave the building and call the gas utility or 911 from outside.

Who it's for

Builders and general contractors adding gas for new homes, additions and commercial spaces. Homeowners adding or moving an appliance or repairing an existing gas line, and anyone remodeling near gas piping.

Where this sits on our service lists

On our New Construction list: “Gas line installation”.

On our Service & Repair list: “Gas line repairs”.

Call or text

Call (760) 912-9831 or text (760) 912-9831 to talk through your project.

The inspector and the city's adopted edition have the final word on every code point on this page. The code library here summarizes the 2025 California Plumbing Code, effective at the start of 2026, in our own words.

Give us a call

Call (760) 912-9831