Repiping means replacing the water supply piping in a building, in whole or in part, with approved pipe and fittings. The new piping is permitted, tested and inspected, and disinfected where the building official requires it.
What it is
A repipe swaps hot and cold supply piping for new pipe, from the point where water enters the building out to each fixture. It doesn't mean the drains, and it doesn't mean the rest of the house gets upgraded: new work has to meet current code, while the existing parts that aren't touched stay as they are (CPC 102.4).
Opening walls and ceilings to reach pipe is a normal part of the job. Who restores the drywall and paint afterward is worth settling before work starts.
How the work goes on a job
- Walk the building, find the main shutoff, and decide the route. Hot and cold lines are sized from the fixtures and pressure (CPC 610.4), with water velocity kept within the limits (CPC 610.12).
- Pick the material. It must meet the drinking water standards and match the code's table for its use (CPC 604.1). Copper tube is Type L or heavier in most places (CPC 604.3); PEX joints use manufacturer fittings and UV protection (CPC 605.9).
- Pull the permit. Replacing pipe is new work, not a small repair (CPC 104.1, CPC 104.2).
- Shut off the water, open walls and ceilings as needed, and install the new piping with control valves at fixtures or a labeled manifold (CPC 606.5), nail plates where pipe sits near the face of framing (CPC 312.9), and hot water pipe insulation (CPC 609.12).
- Pressure-test the new piping and call for the rough inspection before anything is closed up (CPC 609.4, CPC 105.2).
- Reconnect fixtures and the water heater (CPC 604.13), disinfect the system where the building official requires it (CPC 609.10), restore water, and call for the final inspection.
Inspections and tests the code calls for
Water piping is tested with water at working pressure or with air at no less than 50 psi, and it must hold for at least 15 minutes with no leak (CPC 609.4). Plastic pipe isn't air tested except for certain types where the maker allows it.
The rough inspection comes before walls close and the final comes when the work is complete (CPC 105.2). Ask for the certificate of approval at the end.
What you can safely check yourself
- Look for signs worth a conversation: repeated leaks at fittings, stains on ceilings or walls, discolored water, or low flow at several fixtures.
- Find your main shutoff and your water heater's cold shutoff, and make sure each is reachable (CPC 606.2).
- Look at exposed hot water pipe in the garage or crawl space. It should be wrapped (CPC 609.12).
- Ask your plumber what material is proposed and why, and who's pulling the permit.
Who it's for
Homeowners with aging or leaking supply piping, owners of homes that have been remodeled in stages, and builders or general contractors on remodels and additions that touch supply piping.
Where this sits on our service lists
On our Service & Repair list: “Repiping”.
Call or text
Call (760) 912-9831 or text (760) 912-9831 to talk through your project.
The inspector and the city's adopted edition have the final word on every code point on this page. The code library here summarizes the 2025 California Plumbing Code, effective at the start of 2026, in our own words.